Special Operations Shoring Division

Specializing in Cost Effective Shoring Solutions

MISSION STATEMENT

Special Operations Shoring Division’s Mission is to provide complete and competitive shoring solutions from the pre-bid process, through to project completion.

FLYER: Special Operations Shoring Division (PDF)

Special Ops personnel Dan Meredith and Tim Hurst review Take Off blueprints
Take Off/Bid Drawings
Special Ops CAD Specialist Megan MacDonald prepares 3D CAD drawings of a Slide Rail System for pre-bid
CAD 3D Drawings
Custom Engineering on a Shore-Trak System
Special Engineering
Special Ops Shoring Specialist Dan Merideth helps install a Slide Rail System
Installation Assist.
Efficiency Slide Rail System equipment ship out to a job site
Fast Delivery
The Special Operations Shoring Division ready to answer any and all questions
Questions Answered

Helping you obtain work:

  • Review project plans and selection of shoring equipment
  • Providing written quotation and 3D submittal drawings of the proposed shoring solution
  • Conduct pre-construction on-site consultation
  • Providing engineering services, including: tabulated data, P.E. stamped drawings, and site-specific engineering

Providing on-site installation assistance:

  • Provide timely delivery of equipment
  • Respond to unforeseen conditions and/or make job-site equipment changes if required
  • Always available to answer questions

Special Operations Shoring Division Personnel

Tim Hurst, Department HeadTim Hurst image
Office: 517-676-8800
Mobile: 517-881-0784
Megan MacDonaldMegan MacDonald image
Shoring & CAD Specialist
Office: 517-676-8800
Joe Doerfner, SpecialistJoe Doerfner image
Mobile: 517-231-1091
Dan Meredith, SpecialistDan Meredith image
Mobile: 517-243-4284

High Praise for Special Operations Shoring Division

“Everyone I have contacted within your company has been professional, courteous, and knew their job. The person whose actions prompted me to contact you was (Shoring Specialist) Tim Hurst. His experience and ability to train our employees was essential to our success. The last pit we installed with Slide Rail was the real example of Tim’s, and your company’s ability. We encountered a severe challenge due to poor soil conditions, and Tim suggested and organized the installation of a smaller, 4-sided Slide Rail System inside the original ClearSpan System which saved us from a potentially horrible situation and created a dryer, tighter box than the one already installed. I believe in positive reinforcement, and Tim is a highly qualified shoring specialist who definitely proved himself to us and our company.” – Doug Smith, Hoffman Brothers Construction, Battle Creek MI